Accessory Dwelling Units (ADUs)

A site plan submittal is required when applying for a permit involving an ADU.

Upon payment of all fees and evidence of a city building permit, a sewer permit may be issued to the party contracted to do the underground construction.

After obtaining a permit, call 24 hours before beginning sewer construction to schedule an inspection.

Read our ADU Fact Sheet for answers to frequently asked questions and connection examples

Accessory Dwelling Unit Application

Homeowner Information Brochure

Lateral Permit Application

Lateral Installation Guide

Permit Fees and Deposit:

Permit Fee     $50.00
Inspection Fees:    
- Property Line to Building   $150.00
- Main to Property Line (unless previously existing/inspected)   $150.00
Subtotal   $350.00
Deposit (refundable after acceptance)   $500.00
Total Fees and Deposit:   $850.00

The Capacity Fee for Accessory Dwelling Units is $5.88 per square foot (effective 8/1/2024 through 7/31/2025)

If your browser does not allow you to fill out these forms, follow these instructions:

1.  Download Adobe Acrobat Reader and install on your computer
2.  Download the desired USD PDF form and save to your computer
3.  Open the USD PDF form using Acrobat Reader
4.  Complete form and save to your computer
5.  Sign your form in one of these ways:
     a.       Use the Adobe Acrobat Reader “Fill and Sign” tool to type in your signature, or
     b.       Print out the form, manually sign, scan, and save to your computer
6.  Attach to an email and send to permits@unionsanitary.ca.gov

 

 

 
map

Accessibility

Learn More.

5072 Benson Road

Union City, CA 94587-2508

usd logo bottom

Copyright 2016-2024 Union Sanitary District | Search | Site Map | Designed by Formula Design