Awarded Contract Amount: $1,436,000
Estimated Completion Date: 11/2017

This project will include the installation of a new Sludge Degritting System and associated piping, valves, fittings, and controls along with a shaftless screw conveyor to transport dewatered grit to the existing grit hopper.

The degritter equipment removes grit through a two-stage system.  It first separates the grit from the primary clarifier sludge then dewaters the grit.  The dewatered grit is discharged into a hopper for the removal by truck to landfill for disposal, while the sludge is conveyed to the Thickener Control Building for further treatment.